From Aug. 19 through Sept. 1, the southbound track at the station will be closed and passengers traveling in either direction will need to board on the northbound platform.
During the two-week closure, crews will make improvements, including removing and replacing existing tiles, which will help eliminate trapping hazards and safety risks from cracking tiles.
Sound Transit says passengers should pay attention to the direction of the trains arriving at the station as that will be the direction the trains will continue. From 6 a.m. until 10 p.m., every other 1-Line train headed south will stop at Stadium Station rather than continuing south until reaching Angle Lake Station.
Passengers on trains that terminate at Stadium Station will have to wait about 10 minutes before boarding the next train south.
United States Latest News, United States Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Overnight full closures of State Route 89A near Pumphouse Wash Bridge in Oak Creek Canyon Aug. 15-19 and Aug. 22-26
Read more »
Saturn to Reach Opposition Aug. 14 – Watch the Skies
Read more »
US Postal Service to host Aug. 16 'hiring blitz' at San Diego County post office locationsDust off those resumes because USPS is holding a one-day-only “hiring blitz” at over a dozen San Diego County post office locations.
Read more »
Today in history: Aug. 15During World War II, Allied forces landed in southern France in Operation Dragoon, and more events that happened on this day in history.
Read more »
Your Turn, Aug.16: Gun owners want commonsense gun reforms.Read the Express-News letters to the editor for Aug. 16.
Read more »
Termination hearing for Uvalde CISD Police Chief Pete Arredondo scheduled for Aug. 24After two delays, the board has set a date to discuss Police Chief Pete Arredondo's termination. The meeting will be open to the public
Read more »