As it faces yet another set of delays, NASA’s Artemis programme is being shaken up, delaying an actual moon landing in favour of smaller, faster steps forward
NASA is shaking up the plan for its Artemis moon missions. In a press conference on 27 February, NASA administrator Jared Isaacman announced significant changes to the agency’s plans to send humans to the moon for the first time since the Apollo programme ended in 1972.
The Artemis II mission is slated to launch in the next few months, but has had a pair of difficult practice runs. The Space Launch System rocket kept springing leaks when fuel was being pumped in and it ended up being rolled back from the launchpad for analysis and repairs. The last time SLS was launched was in 2022.is a mission to send astronauts in a loop around the moon, in preparation to send a crew to land on the lunar surface with Artemis III. That plan has changed now: Artemis III will no longer be a landing mission, but one to test the Orion crew capsule’s ability to dock with a lander in orbit, as well asThis may seem like a step backwards, but it comes alongside a plan to increase the frequency of launches. The new approach will see Artemis IV and possibly Artemis V land on the moon in 2028. “The entire sequence of Artemis flights needs to represent a step-by-step build-up of capability, with each step bringing us closer to our ability to perform the landing missions,” NASA official Amit Kshatriya said in a . “Each step needs to be big enough to make progress, but not so big that we take unnecessary risk given previous learnings.”for future missions, but Isaacman announced in the press conference that NASA will now aim for a “standardised” version instead of making major changes every few missions. “We’re not going to turn every rocket into a work of art,” Isaacman said during the press conference.Bring the galaxy to your inbox every month, with the latest space news, launches and astronomical occurrences from New Scientist’s Leah Crane.These shifts mark a change in the overall philosophy of the Artemis programme, testing every part of the rocket and mission plan thoroughly before each step and taking small steps quickly instead of making big jumps every few years. Isaacman said that he hopes this will eliminate the delays that have plagued Artemis from the beginning, creating a safer and more sensible
United States Latest News, United States Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Things Keep Getting Worse For NASA's Artemis II Mission With Another Big DelayJosh has worked a freelance writer for the past ten years, writing news and features focusing on the gaming, science, and tech industries. He has covered big events like E3, CES, and a slew of other smaller press events oriented around the latest consumer technology and gadgets.
Read more »
Artemis II Rocket Arrives at Vehicle Assembly Building for TroubleshootingNASA's Artemis II SLS rocket and Orion spacecraft arrive at the Vehicle Assembly Building on February 25, 2026, for helium flow troubleshooting. A news conference will be held on February 27 to discuss the test flight and broader Artemis campaign updates.
Read more »
NASA moves Artemis moon rocket off the launch padNASA is moving its grounded Artemis moon rocket from the launch pad back to its hangar for more repairs. The 4-mile-long slow-motion trek began Wednesday morning at Florida's Kennedy Space Center. It's expected to take all day. Managers ordered the rollback over the weekend after a problem developed with the rocket's helium pressurization system.
Read more »
Artemis 2 moon mission shouldn't launch until late 2026, new analysis of solar superflares suggestsKeith Cooper is a freelance science journalist and editor in the United Kingdom, and has a degree in physics and astrophysics from the University of Manchester.
Read more »
NASA overhauls its Artemis moon landing programNASA is overhauling its Artemis moon landing program. NASA's new administrator Jared Isaacman announced the shakeup in the flight lineup Friday, days after the space agency's new moon rocket returned to its Florida hangar for more repairs. Artemis II — a lunar fly-around by four astronauts — is off until at least April.
Read more »
NASA overhauls its Artemis program to return astronauts to the moonNASA said Friday it’s adding an extra moon mission by Artemis astronauts before attempting a high-risk lunar landing with a crew.
Read more »
