NASA Reviews Options for Next Artemis I Launch Attempt, Prepares To Replace Seal

United States News News

NASA Reviews Options for Next Artemis I Launch Attempt, Prepares To Replace Seal
United States Latest News,United States Headlines
  • 📰 SciTechDaily1
  • ⏱ Reading Time:
  • 25 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 13%
  • Publisher: 68%

After standing down on the NASA Artemis I launch attempt on Saturday, September 3 due to a hydrogen leak, engineering teams have decided to replace a seal while at the launch pad. The seal is on an interface, called the quick disconnect, between the liquid hydrogen fuel feed line on the mobile launc

Performing the work at the launch pad requires technicians to set up an enclosure around the work area to protect the hardware from the weather and other environmental conditions. However, it enables engineers to test the repair under cryogenic, or supercold, conditions. Another advantage to performing the work at the pad is that it allows teams to gather as much data as possible to understand the cause of the issue.

NASA would need to roll the rocket and spacecraft back to the VAB before the next launch attempt to reset the system’s batteries in order to meet the current requirement by the Eastern Range for the certification on the flight termination system. In addition, teams will also check plate coverings on other umbilical interfaces to ensure there are no leaks present at those locations. There are seven main umbilical lines, and each line may have multiple connection points.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

SciTechDaily1 /  🏆 84. in US

United States Latest News, United States Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

NASA to replace seal on leaky Artemis 1 moon rocket at the launch padNASA to replace seal on leaky Artemis 1 moon rocket at the launch padIt's still unclear if the agency will roll the Artemis 1 stack off the pad before its next liftoff attempt.
Read more »

Here's why it's taking NASA so long to attempt another Artemis I launchHere's why it's taking NASA so long to attempt another Artemis I launchNASA has a plan for repairs to the massive new moon rocket after its latest attempt to launch an uncrewed test mission. It will be at least a few weeks before the rocket can make its next attempt. Here's why.
Read more »

NASA picks spacesuit maker for 1st Artemis moonwalkersNASA picks spacesuit maker for 1st Artemis moonwalkersThe deal has a base value of $228.5 million.
Read more »

Artemis I: NASA fixing moon rocket's leak at pad; When is next launch window?Artemis I: NASA fixing moon rocket's leak at pad; When is next launch window?NASA says it will fix the leak that delayed its last Artemis 1 moon launch attempt at the launch pad, but teams may still have to roll the rocket back to the Vehicle Assembly Building before another launch attempt.
Read more »

NASA reveals who will build its next-gen Artemis spacesuits | Digital TrendsNASA reveals who will build its next-gen Artemis spacesuits | Digital TrendsNASA's current spacesuit design is in need of a revamp, and the agency has been looking around for a private firm to take on the task. It's now made a decision.
Read more »

NASA picks Axiom Space to build the first Artemis moonwalk spacesuits | EngadgetNASA picks Axiom Space to build the first Artemis moonwalk spacesuits | EngadgetAxiom said its spacesuits will accommodate a wide range of crew members..
Read more »



Render Time: 2025-02-22 20:44:15