Good news for Kusile power station repairs

United States News News

Good news for Kusile power station repairs
United States Latest News,United States Headlines
  • 📰 mybroadband
  • ⏱ Reading Time:
  • 26 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 14%
  • Publisher: 67%

Eskom has been granted a pollution exemption for Kusile.

Environmental affairs minister Barbara Creecy has announced that her department exempted Eskom from amending its Atmospheric Emission License, subject to certain strict conditions.

“Eskom’s request pertains to a temporary solution to restore lost generation capacity at its Kusile Power Station while a damaged stack undergoes repairs which are due for completion in December 2024,” Creecy stated. She said Eskom must now apply to the National Air Quality Officer for a once-off postponement with the compliance timeframes for minimum emission standards for new plants.

“In the light of the competing factors, I have been called on to make an extraordinarily difficult decision.”

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

mybroadband /  🏆 11. in ZA

United States Latest News, United States Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

JUST IN | Eskom allowed to exceed emission limits at Kusile, to reduce load shedding | BusinessJUST IN | Eskom allowed to exceed emission limits at Kusile, to reduce load shedding | BusinessForestry, Fisheries and the Environment Minister Barbara Creecy, has given Eskom the go-ahead to exceed sulphur dioxide emission limits at the Kusile power station in a bid to alleviate South Africa's severe electricity crisis. | News24_Business
Read more »

Eskom's non-technical losses: Dealing with non-paying municipalities 'not good for elections' | The CitizenEskom's non-technical losses: Dealing with non-paying municipalities 'not good for elections' | The CitizenAt 30% of capacity, non-technical electricity losses consume about 7 500MW of available capacity – more than the deficit that causes load shedding in the first place.
Read more »

Joburg revenue flow at risk amid flight from Eskom power cutsFinance MMC Dada Morero says the move by households and businesses to alternative sources of power will put the city’s finances under strain
Read more »

Eskom reduces power cuts — here is the updated load-shedding timetableEskom reduces power cuts — here is the updated load-shedding timetableEskom has announced a reduction in load-shedding after recovering some generating capacity over the past two days.
Read more »

Improved generating capacity sees Eskom lower power cuts to stage 3Improved generating capacity sees Eskom lower power cuts to stage 3Eskom said that there had been some improvements in generation capacity over the last 48 hours, which has allowed for a lower stage of power cuts.
Read more »

Eskom announces reduced load-sheddingEskom announces reduced load-sheddingThe utility said the change was possible due to “some recovery” in generation capacity in the past 24 hours, without providing further details.
Read more »



Render Time: 2025-04-06 15:39:50