Eskom suspended load-shedding at cost of R8.5m for King Zwelithini's memorial

United States News News

Eskom suspended load-shedding at cost of R8.5m for King Zwelithini's memorial
United States Latest News,United States Headlines
  • 📰 SowetanLIVE
  • ⏱ Reading Time:
  • 48 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 23%
  • Publisher: 63%

Eskom spent R8.5m to suspend load-shedding for the memorial service of King Goodwill Zwelithini in March.

This was revealed in a written reply to parliament by public enterprise minister Pravin Gordhan who said the government considered the memorial a national interest.

The memorial service was held on March 18. At the time, Eskom was implementing rolling blackouts at level two of its load-shedding schedule across the country. According to Gordhan, the government made a request a day before the memorial service for Eskom to consider suspending load-shedding for a duration of four hours between 10am and 2pm.

“The system operator evaluated the request and concluded that this was technically possible without putting the power system at risk and would not result in a higher stage of load-shedding either before or after the memorial service,” Gordhan said in response to a parliamentary question by the DA’s Kevin Mileham.

King Zwelithini was awarded a Special Official Funeral by President Cyril Ramaphosa who also ordered flags fly at half-mast. Though the funeral was held in private and attended by close members of the family, the public memorial service took place at the KwaKhethomthandayo

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

SowetanLIVE /  🏆 13. in ZA

United States Latest News, United States Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Eskom suspended load-shedding at cost of R8.5m for King Zwelithini's memorialEskom spent R8.5m to suspend load-shedding for the memorial service of King Goodwill Zwelithini in March, according to public enterprise minister Pravin Gordhan.
Read more »

Eskom lays out funding plan to move away from coalUtility is considering 8,017MW of projects, ranging from wind power to solar, hydropower and gas, CEO says
Read more »

Eskom lays out funding plan to move away from coalUtility is considering 8,017MW of projects, ranging from wind power to solar, hydropower and gas, CEO says
Read more »

Eskom seeks funds to go greenPower utility considering 8,017MW of projects, including wind power, solar, hydropower and gas
Read more »

Eskom suspended load-shedding at cost of R8.5m for King Zwelithini's memorialEskom spent R8.5m to suspend load-shedding for the memorial service of King Goodwill Zwelithini in March, according to public enterprise minister Pravin Gordhan.
Read more »

EOH says it remains profitable as it battles tough conditionsCovid-19, load-shedding and violence in SA are all making conditions tougher for a group that may no longer be able to do business with the state
Read more »



Render Time: 2025-04-06 11:27:13