Diesel shortage sees Eskom ramp up load shedding to stage 4

United States News News

Diesel shortage sees Eskom ramp up load shedding to stage 4
United States Latest News,United States Headlines
  • 📰 ecr9495
  • ⏱ Reading Time:
  • 11 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 8%
  • Publisher: 51%

ICYMI | Eskom has increased the frequency of power cuts to stage 4 4️⃣ ESKOM Loadshedding

The embattled power utility says further breakdowns and the need to conserve diesel stocks have necessitated stage 4 load shedding.

“This is to conserve the limited diesel stocks and to create space to replenish the dam levels in the pumped storage schemes,” he continued.EU strikes deal on oil price cap to starve Russia's war machine

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

ecr9495 /  🏆 38. in ZA

United States Latest News, United States Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Eskom asks for R20 billion for more dieselEskom asks for R20 billion for more dieselEskom has asked National Treasury for more money to buy diesel.
Read more »

Eskom asks for R19.5-billion diesel bailoutEskom asks for R19.5-billion diesel bailoutSouth Africa’s cash-strapped power utility has asked the National Treasury for 19.5 billion rand to buy diesel to fuel auxiliary power plants.
Read more »

Eskom asks Treasury for R19.5bn to buy dieselFinance minister Enoch Godongwana says Treasury does not have the money
Read more »

Eskom asks Treasury for R19.5bn to buy dieselFinance minister Enoch Godongwana says Treasury does not have the money
Read more »

Phala Phala report: ANC NWC to meet on Sunday, NEC to meet at Nasrec on MondayPhala Phala report: ANC NWC to meet on Sunday, NEC to meet at Nasrec on MondayOn Friday, the NEC cancelled its meeting after some ANC members raised issues with matters being discussed at NEC level before they have passed through the national working committee (NWC).
Read more »

Stage 2 blackouts from 4pmStage 2 blackouts from 4pmEskom has announced that Stage 2 blackouts will return from 4pm on Friday.
Read more »



Render Time: 2025-02-28 09:39:06