KUALA LUMPUR: The construction cost of the East Coast Rail Link (ECRL) project from Kota Bharu to Port Klang along 665 kilometres (km) and 20 stations...
KUALA LUMPUR, 25 Mac -- Menteri Pengangkutan merangkap Ahli Parlimen Seremban Anthony Loke Siew Fook ketika menghadiri Sidang Dewan Rakyat di Parlimen hari ini.--fotoBERNAMA HAK CIPTA TERPELIHARA
Transport Minister Anthony Loke said Malaysia Rail Link as the owner of the ECRL project is subject to the Land Acquisition Act 1960 for the lands involved in the ECRL project. According to him, the Department of Director-General of Lands and Mines together with MRL will identify any remaining land that is uneconomic as a result of land acquisition by the ECRL project.
Ismail wanted to know the final cost of the ECRL construction and what actions should be taken by the government to solve the problem of part of the owner’s land involved in land acquisition because the land can no longer be used as a result of the ECRL construction.
United States Latest News, United States Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
A Father’s Legacy Returns: The RM50 Note That Bridged Time And MemoryIn a heartwarming display of kindness and community spirit, a woman has been reunited with a RM50 note from her late father, thanks to the viral power of social media.
Read more »
Over RM50,000 worth of subsidised diesel seized in Gua MusangFor the second year in a row, Proof is the only Malaysian pizzeria to be ranked in the 50 Top Pizza Asia-Pacific list.
Read more »
Locals Praise Hannah Yeoh for Contributing RM50,000 to the Upkeep of a Mosque During RamadanMinister of Youth and Sports Hannah Yeoh recently shared a TikTok video to her page hannahyeohmp of a sizeable contribution she made to a mosque located in
Read more »
MRL: First phase of ECRL track installation ahead of scheduleKUANTAN, March 20 — The track installation for the first phase of the East Coast Rail Link (ECRL) project, spanning from Kuantan Port City (KPC), Pahang, to Dungun, Terengganu,...
Read more »
Pemasangan landasan projek ECRL fasa pertama siap sebulan lebih awalKUANTAN: Pemasangan landasan Projek Laluan Rel Pantai Timur (ECRL) fasa pertama dari Kuantan Port City (KPC), Pahang ke Dungun, Terengganu sejauh 92 k...
Read more »
First phase of ECRL track installation ahead of sheduleKUANTAN: The track installation for the first phase of the East Coast Rail Link (ECRL) project, spanning from Kuantan Port City (KPC), Pahang, to Dung...
Read more »